http://inthearena.blogs.cnn.com/2011/06/21/fukushima-still-a-ticking-time-bomb/#comment-18425
First of all, it is not at all clear that workers at Fukushima have not died. Read the article: Contract workers registered with TEPCO have mysteriously disappeared from the contractor’s employment records. Mainichi: "Whereabouts of 30 nuclear power plant subcontractors unknown: Health Ministry"
http://mdn.mainichi.jp/mdnnews/news/20110621p2a00m0na005000c.html
Second, there is considerable evidence of ongoing fission at the Fukushima plant reactors given the ongoing production of Iodine-131, which has a 8 day half life. See Gunderson’s Fairewinds updates http://www.fairewinds.com/ and Washington’s blog for an essay with citations on ongoing criticality http://georgewashington2.blogspot.com/2011/06/are-nuclear-reactions-still-occuring-at.html
Third, spent-fuel pool #4 is an ongoing cataclysmic disaster. Building #4 was damaged by #3’s explosion and the spent fuel pool in #4’s attic was reported by the NYT to be cracked. This pool is full of rods and is leaking water and was recently found to be 2/3 empty, meaning there was a high likelihood that the fuel rods were exposed. http://www3.nhk.or.jp/daily/english/20_03.html
Fourth, de-contamination of the radioactive water has not gone well and has had to be stopped over and over because of various problems
http://www3.nhk.or.jp/daily/english/17_05.html
http://www3.nhk.or.jp/daily/english/18_18.html
Fifth, radiation releases continue to be very large
http://sankei.jp.msn.com/affairs/news/110619/dst11061921080017-n1.htm
“Estimates of the radioactive materials emitted double doors opening to the Fukushima No. 2 unit building $ 1.8 billion becquerels”
DISREGARD INDUSTRY TROLLS AND DEMAND TRUTH, TRANSPARENCY AND ACCOUNTABILITY
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.